Class: SSS 3
Term: Second Term
Subject: Block Laying and Brick Laying
Time: 2 Hours 30 Minutes
Total Marks: 70
SECTION A: OBJECTIVES (40 Marks)
Instruction: Answer ALL 40 questions. Each question carries 1 mark.
- All these factors influence roof functional performance EXCEPT ________. (a) resistance to rain entry (b) the number of decorative pictures in the living room (c) stability under wind actions (d) suitable drainage and thermal behaviour
- The correct step when a roof leak occurs at a penetration is to ________. (a) apply plaster under the wet ceiling and ignore the roof (b) change stair width as the first remedy (c) inspect the seal, flashing and adjoining overlaps before specifying repair (d) assume all moisture must be condensation
- ________ allows wastewater to move towards its discharge point in a conventional gravity domestic drain. (a) An adequate continuous fall (b) An upward slope against the flow (c) A trapped high point without outlet (d) An ungraded level channel by default
- Which proposed roof detail does NOT adequately address wind uplift? (a) Correctly fixed roof sheets (b) Appropriate anchorage at supports (c) Reliable edge and ridge connections (d) Loose edge sheets without specified fastening
- For a total floor-to-floor height of 3.0 m and a uniform rise of 150 mm, the staircase requires ________. (a) 15 risers (b) 18 risers (c) 20 risers (d) 22 risers
- Which of the following would best improve safety when designing a frequently used stair? (a) Different riser heights chosen to suit each step (b) Consistent rises and goings with adequate handrail and headroom (c) A reduced landing at a change of direction (d) Treads polished to become as slippery as possible
- The main reason electrical and drainage services must be coordinated early is to ________. (a) avoid clashes and preserve safe access, structural integrity and maintenance (b) ensure pipes serve as electrical conductors (c) remove the need for inspection before occupation (d) make structural drawings optional
- Which of the following best differentiates a dog-legged staircase from a straight flight? (a) The dog-legged stair necessarily has no landing (b) The straight flight has no load-bearing support (c) The dog-legged arrangement changes direction between flights (d) The straight stair is always shorter in total rise
- A drainage drawing identifies repeated right-angle changes without accessible rodding points. The principal concern is ________. (a) difficult maintenance when blockages occur (b) guaranteed reduction in sewage velocity variation (c) automatic compliance with all service standards (d) improved access because of additional corners
- All the following contribute to functional roof design EXCEPT ________. (a) adequate weather resistance (b) ignoring rainwater discharge beside the foundation (c) reliable support and fastening (d) planned rainwater collection and disposal
- Which feature does NOT belong to a sound stair design? (a) Sufficient landing space (b) Reasonable pitch and tread proportions (c) Secure guarding where needed (d) A sudden unmarked reduction in tread width at one step
- Which of the following best identifies a satisfactory domestic drain connection? (a) An unsupported joint designed to sag in use (b) A concealed open end inside the wall cavity (c) A leak-resistant joint with adequate support and a maintained flow gradient (d) A disconnected trap hidden below the fixture
- The ________ is the vertical height gained in one stair step. (a) going (b) landing length (c) stair width (d) riser height
- The main reason roof slope is coordinated with covering type is to ________. (a) make all coverings equally waterproof at zero pitch (b) remove the need for overlap or flashings (c) achieve adequate rainwater run-off and reduce leakage risk (d) avoid considering structural span
- Which of these is not a standard type of stair arrangement? (a) Straight-flight stair (b) Dog-legged stair (c) Quarter-turn stair (d) A roof gutter used as a stepping flight
- All these features belong to a considered household drainage layout EXCEPT ________. (a) discharging raw sewage into an unprotected living area (b) access for inspection and maintenance (c) appropriate gradients and pipe sizes (d) sound junction and trap arrangements
- The main reason standard electrical symbols are used on building drawings is ________. (a) to avoid locating components on the plan (b) to replace wiring safety checks (c) to communicate services consistently without drawing each device realistically (d) to ensure each cable is of identical length
- An important requirement for a roof covering in a rain-prone location is ________. (a) complete reliance on paint without joints or flashings (b) a covering installed without regard to roof pitch (c) deliberate retention of water at vulnerable junctions (d) a weather-tight assembly that sheds water to suitable outlets
- Which of these is not a typical component represented on an electrical-services plan? (a) A stair riser used as the official symbol for every socket (b) A lighting point (c) A switch (d) A socket outlet
- Which of the following is a sound principle for planning domestic drainage? (a) Route foul water to an inaccessible dead end (b) Eliminate all inspection points (c) Allow reverse fall at branch junctions (d) Provide suitable gradients, access points and properly connected traps
- ________ should be shown clearly on a stair sketch to convey the intended direction of movement. (a) A roof-ridge measurement (b) A floor-waste trap (c) An arrow indicating upward travel (d) A water-service stopcock
- The correct step before fixing a long-span roof covering is to ________. (a) verify required support spacing and fixing details against the drawing and product requirements (b) cut all supports away to reduce roof weight (c) install ridge capping before roof support is built (d) choose sheet length without measuring the roof
- A drain installed with inadequate fall may experience ________. (a) guaranteed self-cleaning under every loading (b) elimination of all access requirements (c) automatic removal of every blockage (d) slow flow and accumulation of solids
- A straight flight needs a long horizontal run unavailable in a narrow stairwell. The more useful design response is ________. (a) increase some individual risers without redesign (b) remove the handrail from the narrow side (c) evaluate a compliant turning arrangement with a landing (d) reduce the required headroom at the turn
- The correct step before connecting a fixture to a domestic drain is to ________. (a) increase pipe bends without assessing blockage risk (b) seal all access points permanently (c) place the outlet higher without an appropriate system (d) confirm the pipe route, fall and suitable trap or vent arrangement
- The ________ in a sanitary fixture helps prevent sewer gases entering the room by retaining a water seal. (a) electrical isolator (b) trap (c) cable connector (d) roof batten
- A flight has 12 equal risers at 175 mm each. Its total rise is ________. (a) 1.75 m (b) 2.25 m (c) 2.10 m (d) 2.40 m
- Which action does NOT support safety when interpreting domestic electrical-service drawings? (a) Consulting the symbol legend (b) Guessing a symbol’s meaning when the legend is available (c) Identifying switching points and outlets (d) Checking circuits against the plan
- A proposed covering exceeds its permissible unsupported span. The appropriate design response is ________. (a) reduce fastener quantity until the sheet bends less (b) ignore span because roof pitch is present (c) replace structural checks with a decorative ceiling (d) provide suitable additional support or select a product rated for the span
- ________ is the horizontal distance between successive risers, excluding nosing where that distinction applies. (a) Rise (b) Pitch (c) Going (d) Headroom
- The main reason a landing is provided at a turn in a staircase is to ________. (a) replace the need for properly proportioned risers (b) permit a safe change of direction and break the flight (c) increase the height of each remaining step (d) carry roof covering directly to ground
- Which of the following best describes the function of flashing? (a) Sealing or directing water away from roof junctions and penetrations (b) Substituting for all roof-support members (c) Increasing the rise of stair treads (d) Providing the electrical earth return
- Which of the following is most relevant when choosing roofing material for a given span? (a) Only the name of the supplier (b) Weight, support spacing, structural capacity and manufacturer’s limits (c) The interior wall colour alone (d) The number of occupants’ mobile phones
- All these details require consideration on a stair drawing EXCEPT ________. (a) stair direction and landings (b) riser and tread dimensions (c) available headroom (d) the wall paint supplier’s delivery schedule
- The ________ is the clear vertical space above a stair that helps prevent head injury. (a) headroom (b) going (c) rise (d) nosing
- Which of these is not a normal weather-protection component at a roof junction? (a) Proper ridge capping (b) An open gap left under the ridge solely for storm-water entry (c) Appropriate flashing (d) Correct sheet overlap
- A drawing marks a switch beside an entrance and a ceiling light in the room. The safest interpretation is ________. (a) the switch controls a designated lighting circuit subject to the drawing legend (b) the switch necessarily operates the house drainage pump (c) every symbol refers to a separate roof component (d) the light is a structural support device
- The ________ at the lower roof edge can direct rainwater into the collection or disposal system. (a) riser (b) gutter (c) DPC (d) stair landing
- The correct step before setting out stairs in a restricted plan is to ________. (a) confirm total rise, available run and permitted stair arrangement (b) select the final colour without checking dimensions (c) fix the handrail before the stair geometry is set (d) assume every building has the same floor-to-floor height
- ________ is the upper meeting line of two pitched roof planes. (a) Eaves (b) Ridge (c) Valley gutter (d) Fascia
SECTION B: THEORY (30 Marks)
Instruction: Answer Question 1 and any other TWO questions. Each question carries 10 marks.
1. Answer the following questions.
(a) A building has a total stair rise of 3.15 m and the proposed uniform rise is 175 mm. Calculate the required number of risers and describe three further checks in the stair layout. (5 marks)
(b) Compare straight-flight and dog-legged stair arrangements by explaining five implications for space use, circulation, safety or drawing details. (5 marks)
2. Answer the following questions.
(a) A roof is proposed for a building with a long unsupported distance and frequent heavy rain. Evaluate five criteria for selecting the covering and supporting system. (5 marks)
(b) Identify five construction checks that would reduce water penetration at the edge, ridge and roof penetrations. (5 marks)
3. Answer the following questions.
(a) A domestic drain is slow and repeatedly blocks. Analyse five possible defects in its layout or installation. (5 marks)
(b) Explain five principles of a good domestic drainage system, relating each to operation or maintenance. (5 marks)
4. Answer the following questions.
(a) Explain five information items that must be correctly interpreted before work begins from a stair-and-services drawing. (5 marks)
(b) A contractor proposes to install electrical and drainage services without coordinating them with a roof and staircase. Explain five likely consequences or preventative measures. (5 marks)
OBJECTIVE MARKING SCHEME
Question 1 – ✅ (b) the number of decorative pictures in the living room
Question 2 – ✅ (c) inspect the seal, flashing and adjoining overlaps before specifying repair
Question 3 – ✅ (a) An adequate continuous fall
Question 4 – ✅ (d) Loose edge sheets without specified fastening
Question 5 – ✅ (c) 20 risers
Question 6 – ✅ (b) Consistent rises and goings with adequate handrail and headroom
Question 7 – ✅ (a) avoid clashes and preserve safe access, structural integrity and maintenance
Question 8 – ✅ (c) The dog-legged arrangement changes direction between flights
Question 9 – ✅ (a) difficult maintenance when blockages occur
Question 10 – ✅ (b) ignoring rainwater discharge beside the foundation
Question 11 – ✅ (d) A sudden unmarked reduction in tread width at one step
Question 12 – ✅ (c) A leak-resistant joint with adequate support and a maintained flow gradient
Question 13 – ✅ (d) riser height
Question 14 – ✅ (c) achieve adequate rainwater run-off and reduce leakage risk
Question 15 – ✅ (d) A roof gutter used as a stepping flight
Question 16 – ✅ (a) discharging raw sewage into an unprotected living area
Question 17 – ✅ (c) to communicate services consistently without drawing each device realistically
Question 18 – ✅ (d) a weather-tight assembly that sheds water to suitable outlets
Question 19 – ✅ (a) A stair riser used as the official symbol for every socket
Question 20 – ✅ (d) Provide suitable gradients, access points and properly connected traps
Question 21 – ✅ (c) An arrow indicating upward travel
Question 22 – ✅ (a) verify required support spacing and fixing details against the drawing and product requirements
Question 23 – ✅ (d) slow flow and accumulation of solids
Question 24 – ✅ (c) evaluate a compliant turning arrangement with a landing
Question 25 – ✅ (d) confirm the pipe route, fall and suitable trap or vent arrangement
Question 26 – ✅ (b) trap
Question 27 – ✅ (c) 2.10 m
Question 28 – ✅ (b) Guessing a symbol’s meaning when the legend is available
Question 29 – ✅ (d) provide suitable additional support or select a product rated for the span
Question 30 – ✅ (c) Going
Question 31 – ✅ (b) permit a safe change of direction and break the flight
Question 32 – ✅ (a) Sealing or directing water away from roof junctions and penetrations
Question 33 – ✅ (b) Weight, support spacing, structural capacity and manufacturer’s limits
Question 34 – ✅ (d) the wall paint supplier’s delivery schedule
Question 35 – ✅ (a) headroom
Question 36 – ✅ (b) An open gap left under the ridge solely for storm-water entry
Question 37 – ✅ (a) the switch controls a designated lighting circuit subject to the drawing legend
Question 38 – ✅ (b) gutter
Question 39 – ✅ (a) confirm total rise, available run and permitted stair arrangement
Question 40 – ✅ (b) Ridge
THEORY MARKING SCHEME (Answer 3 × 10 = 30 Marks)
Question 1 (10 Marks)
(a) 5 marks: Number = 3150/175 = 18 risers (2); checking available going/run (1); adequate landing and change of direction (1); headroom/handrail or uniform tread geometry (1).
(b) 5 marks: Straight flight continuous direction (1); dog-legged changes direction (1); landings (1); space/run planning (1); guarding, headroom or dimensional coordination (1).
Question 2 (10 Marks)
(a) 5 marks: Allowable span (1); covering self-weight and loads (1); suitable pitch (1); water shedding/flashings (1); fixing and wind resistance (1).
(b) 5 marks: Correct overlap (1); ridge capping (1); suitable flashing (1); gutter/drainage (1); appropriate weatherproof fixing and seal (1).
Question 3 (10 Marks)
(a) 5 marks: Inadequate or reverse gradient (1); undersized pipe (1); excessive bends (1); poor junctions (1); missing access/maintenance arrangements (1).
(b) 5 marks: Continuous proper fall (1); sound joints (1); suitable traps and vents (1); inspection access (1); adequate sizing/routing (1).
Question 4 (10 Marks)
(a) 5 marks: Levels and heights (1); stair geometry and direction (1); landings and clearances (1); symbols and legend for electrical system (1); drainage routes/gradient and junctions (1).
(b) 5 marks: Service clashes (1); protected cable/wet area separation (1); maintenance access (1); structural penetrations/damage (1); planned routes and competent checking (1).