Class: SSS 3
Term: First Term
Subject: Building Construction
Time: 2 Hours 30 Minutes
Total Marks: 70
SECTION A: OBJECTIVES (40 Marks)
Instruction: Answer ALL 40 questions. Each question carries 1 mark.
- The correct step before concealing new drainage pipework is to ________. (a) inspect alignment, joints, gradients and required tests (b) cover the route before a visual check (c) install floor finishes without recording access points (d) allow unsupported sagging along the line
- The ________ receives suitable septic-tank effluent for soil infiltration where ground and site conditions permit. (a) ridge flashing (b) water-closet cistern (c) soakaway (d) roof valley
- Which of these is not a normal plastering or rendering tool? (a) A service meter used instead of a trowel and straightedge (b) Trowel (c) Float (d) Straightedge
- Which of the following should guide the selection of a floor finish for a heavily used passage? (a) Only initial appearance, independent of use (b) Whether a finishing coat can carry a roof (c) Wear resistance, ease of cleaning and slip behaviour (d) The original builder’s preferred brand alone
- In an off-grid photovoltaic system, an inverter may be required to ________. (a) turn drainage water into electricity (b) replace all charge-control functions regardless of design (c) convert every appliance to operate on sunlight alone (d) convert appropriate DC input to AC for compatible appliances
- All these are characteristics of a well-designed domestic drainage system EXCEPT ________. (a) inaccessible dead ends deliberately installed at every junction (b) appropriate gradients (c) sound, watertight joints (d) inspection and maintenance access
- The main reason a roof requires suitable fixings in addition to weatherproof coverings is to ________. (a) substitute internal paint for structural bracing (b) avoid all overlap details (c) ensure gutters carry roof dead loads (d) transfer wind and other forces safely into the supporting structure
- Which arrangement does NOT adequately manage domestic wastewater? (a) Direct discharge from a blocked fixture to an open public walkway (b) A correctly vented trap (c) A maintained drainage line (d) A properly sited treatment/disposal system
- Which of the following best explains why solar modules must be positioned thoughtfully on a building? (a) Module output is independent of installation direction (b) Shading and orientation affect useful solar electricity production (c) Permanent shade increases generation (d) Roof-support capacity never matters
- All of these assist interpretation of a building drawing EXCEPT ________. (a) clear dimensioning (b) consistent scale (c) appropriate symbols and section indications (d) assuming measurement units change randomly between linked views
- The main reason plastering is applied in suitable coats is to ________. (a) build a bonded, even finish with controlled thickness and drying (b) make the backing surface’s soundness irrelevant (c) allow loose substrate particles to remain (d) eliminate the need to mix materials properly
- A cement-based external protective mortar finish to a wall is most accurately described as ________. (a) substructure bearing (b) electrical containment (c) timber planing (d) rendering
- A detail at scale 1:20 represents a real 4 m length by a drawing length of ________. (a) 20 mm (b) 200 mm (c) 80 mm (d) 400 mm
- The correct step before applying roof sheets near an exposed eaves edge is to ________. (a) ignore wind exposure because gravity is present (b) start with gutter decoration and delay fixing checks (c) check supports, specified fixing pattern and edge weatherproofing (d) choose screws solely by head colour
- The correct step when plaster repeatedly debonds from masonry is to ________. (a) investigate moisture, substrate cleanliness and bond before repairing (b) recoat immediately without removing unsound material (c) apply more paint to conceal movement (d) increase coat thickness regardless of adhesion
- Which action does NOT preserve the meaning of a reduced construction drawing? (a) Applying the stated reduction ratio (b) Reading the paper length as if it were full size without checking the scale (c) Checking detailed dimensions (d) Retaining relative proportions
- All these are reasonable floor-preparation activities EXCEPT ________. (a) checking soundness and evenness (b) cleaning the substrate (c) laying a finish over loose debris and standing moisture (d) providing appropriate drying or moisture control
- Which of the following best distinguishes a sliding gate from a swing gate? (a) A sliding gate rotates entirely about a vertical hinge (b) A sliding gate translates laterally along its designed guide or track (c) A swing gate has no moving parts (d) A swing gate always occupies less side space than a sliding gate
- The ________ view shows three-dimensional appearance with lines converging towards vanishing points. (a) first-angle elevation (b) plan section (c) perspective (d) orthographic end elevation
- Which action does NOT support a reliable installed solar system? (a) Verifying component ratings (b) Connecting modules and batteries without regard to rated electrical values (c) Planning load demand (d) Using suitable protection and wiring arrangements
- ________ is the on-site treatment chamber in which settleable sewage solids are retained for biological breakdown. (a) Soakaway pit (b) Rainwater gutter (c) Trapped floor drain (d) Septic tank
- Which of these is not a typical functional consideration in gate design? (a) Width of access (b) Method of opening (c) The proprietor’s examination timetable (d) Weight and fixing arrangement
- A gravity drain without sufficient gradient is likely to cause ________. (a) faster self-cleansing flow under every discharge (b) sluggish flow and deposits that increase blockage risk (c) reliable venting without any trap (d) a reduction in maintenance needs by definition
- ________ is the operation of converting a drawing to a larger scale while preserving its proportions. (a) Perspective shortening (b) Hatching (c) Enlargement (d) Section lining
- Which of these is not a primary function of a ceiling? (a) Concealing some services and roof members (b) Acting as the building’s main foundation bearing layer (c) Providing an appropriate internal finish (d) Supporting thermal or acoustic comfort where designed
- ________ converts incident sunlight directly into electrical energy for the connected solar power system. (a) Septic-tank chamber (b) Ceiling insulation board (c) Photovoltaic module (d) Floor tile underlay
- A narrow site requires vehicle entry without a leaf projecting into the driveway. One option to evaluate is ________. (a) a correctly supported sliding gate with sufficient lateral clearance (b) an outward swing leaf occupying the highway (c) a gate with no structural guide (d) a fixed panel blocking the entry
- Which proposed ceiling finish does NOT account for the environment of use? (a) Choosing a washable finish where appropriate (b) Using a moisture-vulnerable lining in a persistently damp setting without protection (c) Providing suitable fixing to a supporting framework (d) Considering service access in design
- Which of the following is an essential distinction between a septic tank and a soakaway? (a) Both are primarily roof supports (b) A soakaway must receive raw sewage in every site (c) A septic tank is only a storage space for clean rainwater (d) A tank settles and treats wastewater; a soakaway disposes of suitable effluent into soil
- The ________ is a thin levelling layer commonly laid on a concrete base before a selected final floor finish. (a) ridge cap (b) screed (c) stair newel (d) flashing
- The ________ stores electrical energy where the designed solar installation includes battery storage. (a) battery (b) roof flashing (c) soakaway (d) plastering float
- Which of the following best preserves accuracy while transferring a construction detail from manual drawing to CAD? (a) Matching line thickness without checking the scale (b) Drawing every component freehand on screen without constraints (c) Replacing all dimension figures with colour labels (d) Retaining true geometry, specified units and intended dimensions
- The correct step before constructing a boundary fence is to ________. (a) verify boundary line, intended height, structural support and ground conditions (b) choose a decorative finial without site measurements (c) ignore the location of entrances (d) place footings without relating them to wall loads
- The main reason a gate post needs sound footing and adequate support is to ________. (a) avoid checking its vertical alignment (b) enable hinges to replace the supporting wall (c) remove all impact of wind on a solid gate (d) resist the gate’s weight, movement and operating forces
- A PVC floor finish laid over a damp, uneven base may suffer ________. (a) improved performance from water beneath the sheet (b) automatic correction of unevenness (c) poor adhesion, distortion and premature failure (d) guaranteed waterproof bonding regardless of base
- All these are relevant to solar-system design EXCEPT ________. (a) matching load demand (b) using ceiling paint shade as the sole measure of electrical capacity (c) considering module and storage capacity (d) safe cable protection and appropriate mounting
- A wide, heavy swing gate starts to sag at the hinge side. The most likely area needing investigation is ________. (a) the thickness of a distant floor tile (b) the colour of the adjacent ceiling (c) hinge fixing, frame stiffness and supporting gatepost (d) the location of a roof skylight only
- ________ is a floor finish obtained by exposing and polishing a suitable matrix containing decorative aggregates. (a) Unfinished soil (b) A standard roof truss (c) Loose untreated sawdust (d) Terrazzo
- The main reason soakaway siting requires soil and groundwater assessment is to ________. (a) confirm infiltration suitability and limit environmental or health risk (b) ensure all soil types absorb wastewater identically (c) remove the need to empty septic tanks (d) make sewer pipe gradients irrelevant
- Roof covering damage after strong wind suggests checking ________. (a) the colour of floor screed alone (b) only the number of rooms in the building (c) whether every wall tile has been grouted (d) fixing adequacy, laps, anchorage and edge details
SECTION B: THEORY (30 Marks)
Instruction: Answer Question 1 and any other TWO questions. Each question carries 10 marks.
1. Answer the following questions.
(a) A section drawing shows a wall detail 150 mm long representing a real length of 3 m. Determine the scale and explain three checks that ensure a CAD enlargement preserves construction information. (5 marks)
(b) Compare perspective and orthographic drawing use in construction by stating five relevant purposes or limitations. (5 marks)
2. Answer the following questions.
(a) An occupied building has water stains around its roof and persistently damp walls. Explain five investigations or corrective actions before redecorating. (5 marks)
(b) Explain five site procedures for achieving a durable rendered finish on external masonry. (5 marks)
3. Answer the following questions.
(a) An off-grid building has a solar array, charge controller, batteries and inverter. Explain five functions or design relationships among these components. (5 marks)
(b) Compare five purposes or installation considerations of a septic tank and soakaway arrangement. (5 marks)
4. Answer the following questions.
(a) A client wants a durable floor, a finished ceiling, a boundary fence and a heavy entrance gate. Assess five criteria for selecting or installing these components. (5 marks)
(b) Outline five checks before handing over a newly installed drainage system with a wet-area floor finish. (5 marks)
OBJECTIVE MARKING SCHEME
Question 1 – ✅ (a) inspect alignment, joints, gradients and required tests
Question 2 – ✅ (c) soakaway
Question 3 – ✅ (a) A service meter used instead of a trowel and straightedge
Question 4 – ✅ (c) Wear resistance, ease of cleaning and slip behaviour
Question 5 – ✅ (d) convert appropriate DC input to AC for compatible appliances
Question 6 – ✅ (a) inaccessible dead ends deliberately installed at every junction
Question 7 – ✅ (d) transfer wind and other forces safely into the supporting structure
Question 8 – ✅ (a) Direct discharge from a blocked fixture to an open public walkway
Question 9 – ✅ (b) Shading and orientation affect useful solar electricity production
Question 10 – ✅ (d) assuming measurement units change randomly between linked views
Question 11 – ✅ (a) build a bonded, even finish with controlled thickness and drying
Question 12 – ✅ (d) rendering
Question 13 – ✅ (b) 200 mm
Question 14 – ✅ (c) check supports, specified fixing pattern and edge weatherproofing
Question 15 – ✅ (a) investigate moisture, substrate cleanliness and bond before repairing
Question 16 – ✅ (b) Reading the paper length as if it were full size without checking the scale
Question 17 – ✅ (c) laying a finish over loose debris and standing moisture
Question 18 – ✅ (b) A sliding gate translates laterally along its designed guide or track
Question 19 – ✅ (c) perspective
Question 20 – ✅ (b) Connecting modules and batteries without regard to rated electrical values
Question 21 – ✅ (d) Septic tank
Question 22 – ✅ (c) The proprietor’s examination timetable
Question 23 – ✅ (b) sluggish flow and deposits that increase blockage risk
Question 24 – ✅ (c) Enlargement
Question 25 – ✅ (b) Acting as the building’s main foundation bearing layer
Question 26 – ✅ (c) Photovoltaic module
Question 27 – ✅ (a) a correctly supported sliding gate with sufficient lateral clearance
Question 28 – ✅ (b) Using a moisture-vulnerable lining in a persistently damp setting without protection
Question 29 – ✅ (d) A tank settles and treats wastewater; a soakaway disposes of suitable effluent into soil
Question 30 – ✅ (b) screed
Question 31 – ✅ (a) battery
Question 32 – ✅ (d) Retaining true geometry, specified units and intended dimensions
Question 33 – ✅ (a) verify boundary line, intended height, structural support and ground conditions
Question 34 – ✅ (d) resist the gate’s weight, movement and operating forces
Question 35 – ✅ (c) poor adhesion, distortion and premature failure
Question 36 – ✅ (b) using ceiling paint shade as the sole measure of electrical capacity
Question 37 – ✅ (c) hinge fixing, frame stiffness and supporting gatepost
Question 38 – ✅ (d) Terrazzo
Question 39 – ✅ (a) confirm infiltration suitability and limit environmental or health risk
Question 40 – ✅ (d) fixing adequacy, laps, anchorage and edge details
THEORY MARKING SCHEME (Answer 3 × 10 = 30 Marks)
Question 1 (10 Marks)
(a) 5 marks: Scale 150:3000 = 1:20 (2); consistent units (1); preserved geometry (1); correct dimensions/annotations (1).
(b) 5 marks: Perspective visualises 3D impression (1); orthographic shows measured views (1); perspective depth convergence (1); use of elevations/plans for dimensions (1); coordinated checking/detailing (1).
Question 2 (10 Marks)
(a) 5 marks: Inspect roof laps/flashings (1); gutters/drainage (1); wall damp source/DPC (1); repair defective plaster/render (1); dry and prepare substrates (1).
(b) 5 marks: Clean base (1); prepare bond/appropriate dampening (1); select materials and mix (1); apply proper coats/thickness (1); cure and protect (1).
Question 3 (10 Marks)
(a) 5 marks: Modules generate DC (1); controller manages charging (1); battery stores energy (1); inverter supplies suitable AC (1); load ratings/protection and wiring coordination (1).
(b) 5 marks: Primary settlement (1); biological treatment (1); effluent infiltration (1); soil/siting conditions (1); maintenance and environmental protection (1).
Question 4 (10 Marks)
(a) 5 marks: Floor substrate and wear/slip (1); ceiling material to environment (1); fence boundary/foundation (1); gate dimensions/operation (1); hinges/posts/structural support (1).
(b) 5 marks: Continuous falls (1); secure watertight connections (1); trap and inspection access (1); testing/cleanliness (1); dry stable base and correctly laid floor finish (1).