Class: SSS 3
Term: First Term
Subject: Carpentry and Joinery
Time: 2 Hours 30 Minutes
Total Marks: 70
SECTION A: OBJECTIVES (40 Marks)
Instruction: Answer ALL 40 questions. Each question carries 1 mark.
- When a prefabricated timber frame arrives with dimensions outside the site setting-out grid, the best response is ________. (a) cut every connector at random (b) check the drawings and tolerances before forcing the components into place (c) hide the misfit behind cladding (d) remove diagonal bracing permanently
- All these are sensible scaffold precautions EXCEPT ________. (a) removing ties and guardrails during use to create more movement space (b) checking base support (c) controlling platform loads (d) providing safe access and edge protection
- Which of these is not a safe ladder-maintenance practice? (a) Inspecting for cracks (b) Keeping rungs secure (c) Storing the ladder to prevent damage (d) Continuing to use a ladder with damaged stiles or rungs until it breaks
- Which installation does NOT demonstrate sound roofing practice? (a) Fixing coverings to suitable supports (b) Checking joint weatherproofing (c) Omitting specified roof bracing because the covering looks stiff (d) Supporting the roof against relevant loads
- The correct step before cutting timber stair members is to ________. (a) choose a handrail colour without dimensions (b) calculate total rise, number of risers, going and landing layout (c) assume a standard rise fits all building heights (d) omit checks on clearances
- The ________ is a diagonal or other stabilising element used to improve the scaffold’s resistance to sway. (a) paint float (b) tile spacer (c) ridge cap (d) brace
- Which of the following is most relevant when locating stairs in a building? (a) Available plan space, circulation and headroom, together with safe geometry (b) Only the nearest wall colour (c) Whether every room has identical furniture (d) The supplier’s brand of roofing felt
- The main reason a stair stringer or equivalent supporting member is important is ________. (a) it replaces all landing supports automatically (b) it supports and transfers stair loads to the designed bearings (c) it is the only component that receives a paint finish (d) it prevents any need for dimensioning
- A panel shows edge swelling after installation in a damp area. The most probable cause requiring assessment is ________. (a) excessive strength of dry metal fixings (b) a change in stair-tread geometry (c) moisture exposure beyond the board’s resistance or poor edge protection (d) too many roof trusses
- A modular framed wall is square at fabrication but out of plumb after erection. The first checks should examine ________. (a) whether the roof paint has fully dried (b) the ladder manufacturer’s address only (c) the number of panels in a different building (d) foundation level, temporary bracing and anchor alignment
- Which method does NOT support effective external cladding performance? (a) Providing a managed weather barrier (b) Sealing moisture behind an unventilated defective assembly where drainage is needed (c) Allowing drainage at appropriate joints (d) Using fixings compatible with the cladding material
- Which of the following is a basic requirement for a sound working scaffold? (a) Unsecured planks with unsupported overhangs (b) Access achieved by climbing outside braces randomly (c) No attention to intended loads (d) Stable base, adequate bracing and safe working platform
- ________ is the attachment of a protective or decorative outer layer to a wall or structural surface. (a) End-grain seasoning (b) Timber grading (c) Cladding (d) Scaffold bracing
- The correct step when adding an unusually heavy ceiling to an existing timber roof is to ________. (a) attach it directly to any thin panel available (b) ignore member spans because the ceiling is internal (c) remove bracing to create clearance (d) assess the additional load and the available support or fixing design
- The main reason external roofing material should resist weathering is to ________. (a) limit premature deterioration and rain penetration (b) substitute for all foundation soil tests (c) enable roof sheets to support arbitrary loads (d) remove the need for drainage design
- All these can improve wall-panelling quality EXCEPT ________. (a) checking substrate alignment (b) fixing untreated wet panels tightly without movement provision (c) allowing appropriate joint details (d) using suitable mechanical or adhesive fixings
- Which feature does NOT indicate a well-designed staircase? (a) Adequate walking width (b) Reasonable tread and riser dimensions (c) An abrupt reduction in clear headroom near a landing (d) Secure guarding at exposed sides
- An exposed external timber-cladding project should first account for ________. (a) the inside wall’s paint label alone (b) moisture movement, fixing and weather protection (c) the number of nails in unused stock (d) whether every board is from the same tree
- The ________ is the horizontal part of a stair on which the user places a foot. (a) riser (b) stringer (c) handrail (d) tread
- The main reason diagonal bracing may be required in a timber frame is to ________. (a) increase moisture content deliberately (b) replace every vertical support (c) restrain racking caused by lateral forces (d) make panel layout independent of structural geometry
- For a proposed flight with a total rise of 2.8 m and uniform risers of 175 mm, the number of risers is ________. (a) 16 (b) 14 (c) 18 (d) 20
- ________ supports a roof covering at intervals between the principal roof members in suitable timber roof systems. (a) A floor waste pipe (b) A purlin or batten, as specified (c) A door-stop wedge (d) A skirting bead
- Which procedure does NOT maintain a stable framed partition? (a) Plumbing frame studs (b) Providing specified anchors (c) Removing essential bracing before final fixing is complete (d) Checking joints and loads
- Which of the following best explains why roof and ceiling designs should be coordinated? (a) Ceiling finish automatically becomes the roof weatherproof layer (b) A ceiling removes all need for roof structure (c) Roof pitch has no effect on upper-room geometry (d) Loads, services, fixing positions and clearances may affect both systems
- The correct step before installing a prefabricated frame unit is to ________. (a) begin cutting members without reading the assembly drawing (b) confirm foundation levels, anchor positions and lifting plan (c) apply roof coverings before checking supports (d) assume all site tolerances are zero
- Which of the following best explains a benefit of prefabrication? (a) Prefabricated work is automatically exempt from inspection (b) Off-site manufacture eliminates all transportation limits (c) Prefabrication prevents any assembly error (d) Controlled off-site production can improve repeatability and shorten site assembly
- ________ is a temporary platform system giving workers access and support while undertaking work at height. (a) Scaffold (b) Floor screed (c) Roof eaves (d) Timber cladding
- ________ uses pre-made components assembled into a larger structure at the site. (a) Site-only hand hewing (b) Prefabrication (c) Unplanned demolition (d) Weathering
- The main reason timber species and grade matter in structural frame members is ________. (a) strength, durability and dimensional stability differ among materials (b) all timber has identical moisture response (c) wall panels alone can replace every beam (d) selection should depend solely on surface colour
- A stair landing meets a wall with inadequate bearing. The design should be reviewed for ________. (a) the shade of the landing varnish only (b) safe support and adequate load transfer at the junction (c) the size of nearby wall tiles (d) the direction of room curtains
- A contractor proposes to span a larger distance with the same timber purlin size. The technical issue is ________. (a) whether strength and deflection remain acceptable for the new span (b) whether the fascia is painted white (c) the manufacturer’s telephone code (d) the number of ceiling fans sold locally
- The correct step when scaffold components show visible damage is to ________. (a) increase the number of users to test it (b) hide the damage behind sheeting (c) remove or replace defective components before the platform is used (d) permit access while repair is postponed
- ________ is the total vertical displacement from one floor level to another served by a flight of stairs. (a) Total rise (b) Tread depth (c) Stair pitch (d) Landing length
- All these must be checked for a prefabricated assembly EXCEPT ________. (a) transport and lifting constraints (b) connection details (c) dimensional tolerance and site access (d) the supplier’s unrelated advertising awards
- The ________ member in a typical truss arrangement often forms the lower horizontal component resisting spreading action. (a) roof flashing (b) paint bead (c) tie member or bottom chord (d) ceiling tile
- A portable ladder is set at an unstable angle and rests on loose blocks. The main concern is ________. (a) the risk of slipping or overturning due to insecure footing and support (b) its surface paint’s shade (c) the absence of a decorative rail at ground level (d) whether the ladder was stored near a roof tile
- All these contribute to safe stair construction EXCEPT ________. (a) uniform proportions (b) properly supported flights (c) random changes in riser height between adjacent steps (d) suitable handrails and landings
- The correct step before fixing wall panels to an existing frame is to ________. (a) confirm frame alignment, condition and required panel joint arrangement (b) conceal rotten members without inspection (c) load the cladding before securing fixings (d) omit movement joints in a large panel without checking design
- Which of the following best distinguishes manufactured board from solid sawn timber? (a) Manufactured board never requires edge finishing (b) Solid timber cannot carry load (c) Manufactured board is formed by bonding wood constituents into panels with engineered properties (d) All board products behave identically in water
- The main reason scaffolds require inspection after significant alteration is to ________. (a) assume every change increases load capacity (b) replace the need for competent erection (c) check only the paint finish (d) confirm stability and protection remain effective under the changed arrangement
SECTION B: THEORY (30 Marks)
Instruction: Answer Question 1 and any other TWO questions. Each question carries 10 marks.
1. Answer the following questions.
(a) A building is being lined with timber wall panels. Evaluate five checks needed to prevent moisture damage, distortion and fixing failure. (5 marks)
(b) Compare solid timber and manufactured board for wall panelling or cladding by giving five useful design distinctions. (5 marks)
2. Answer the following questions.
(a) A prefabricated wall frame does not align with the foundation anchors when delivered. Analyse five causes or corrective procedures before assembly proceeds. (5 marks)
(b) Explain five advantages and limitations to consider when choosing site-built versus prefabricated timber structures. (5 marks)
3. Answer the following questions.
(a) A staircase must climb 2.8 m with 175 mm risers. Calculate the number of risers and explain three additional dimensional or safety checks. (5 marks)
(b) Discuss five considerations in locating a timber staircase in a small building. (5 marks)
4. Answer the following questions.
(a) Inspectors find loose scaffold boards and damaged ladder rungs at a building site. State five immediate safety or maintenance actions. (5 marks)
(b) Compare five roles of roofing, ceiling components and their support systems in a timber-framed building. (5 marks)
OBJECTIVE MARKING SCHEME
Question 1 – ✅ (b) check the drawings and tolerances before forcing the components into place
Question 2 – ✅ (a) removing ties and guardrails during use to create more movement space
Question 3 – ✅ (d) Continuing to use a ladder with damaged stiles or rungs until it breaks
Question 4 – ✅ (c) Omitting specified roof bracing because the covering looks stiff
Question 5 – ✅ (b) calculate total rise, number of risers, going and landing layout
Question 6 – ✅ (d) brace
Question 7 – ✅ (a) Available plan space, circulation and headroom, together with safe geometry
Question 8 – ✅ (b) it supports and transfers stair loads to the designed bearings
Question 9 – ✅ (c) moisture exposure beyond the board’s resistance or poor edge protection
Question 10 – ✅ (d) foundation level, temporary bracing and anchor alignment
Question 11 – ✅ (b) Sealing moisture behind an unventilated defective assembly where drainage is needed
Question 12 – ✅ (d) Stable base, adequate bracing and safe working platform
Question 13 – ✅ (c) Cladding
Question 14 – ✅ (d) assess the additional load and the available support or fixing design
Question 15 – ✅ (a) limit premature deterioration and rain penetration
Question 16 – ✅ (b) fixing untreated wet panels tightly without movement provision
Question 17 – ✅ (c) An abrupt reduction in clear headroom near a landing
Question 18 – ✅ (b) moisture movement, fixing and weather protection
Question 19 – ✅ (d) tread
Question 20 – ✅ (c) restrain racking caused by lateral forces
Question 21 – ✅ (a) 16
Question 22 – ✅ (b) A purlin or batten, as specified
Question 23 – ✅ (c) Removing essential bracing before final fixing is complete
Question 24 – ✅ (d) Loads, services, fixing positions and clearances may affect both systems
Question 25 – ✅ (b) confirm foundation levels, anchor positions and lifting plan
Question 26 – ✅ (d) Controlled off-site production can improve repeatability and shorten site assembly
Question 27 – ✅ (a) Scaffold
Question 28 – ✅ (b) Prefabrication
Question 29 – ✅ (a) strength, durability and dimensional stability differ among materials
Question 30 – ✅ (b) safe support and adequate load transfer at the junction
Question 31 – ✅ (a) whether strength and deflection remain acceptable for the new span
Question 32 – ✅ (c) remove or replace defective components before the platform is used
Question 33 – ✅ (a) Total rise
Question 34 – ✅ (d) the supplier’s unrelated advertising awards
Question 35 – ✅ (c) tie member or bottom chord
Question 36 – ✅ (a) the risk of slipping or overturning due to insecure footing and support
Question 37 – ✅ (c) random changes in riser height between adjacent steps
Question 38 – ✅ (a) confirm frame alignment, condition and required panel joint arrangement
Question 39 – ✅ (c) Manufactured board is formed by bonding wood constituents into panels with engineered properties
Question 40 – ✅ (d) confirm stability and protection remain effective under the changed arrangement
THEORY MARKING SCHEME (Answer 3 × 10 = 30 Marks)
Question 1 (10 Marks)
(a) 5 marks: Material grade/condition (1); moisture suitability (1); substrate alignment (1); appropriate fixings (1); movement joints and protection (1).
(b) 5 marks: Strength/structure (1); dimensional stability (1); moisture sensitivity (1); finish/edge treatment (1); size and fabrication or cost (1).
Question 2 (10 Marks)
(a) 5 marks: Review drawings (1); check module dimensions (1); survey foundation levels/anchors (1); verify tolerances (1); plan approved remediation and bracing (1).
(b) 5 marks: Repeatable production (1); possible reduced site time (1); transport constraints (1); connection/tolerance demands (1); design flexibility/quality inspection (1).
Question 3 (10 Marks)
(a) 5 marks: 2800/175 = 16 risers (2); suitable going (1); landing and headroom (1); safe support/guarding (1).
(b) 5 marks: Circulation route (1); available horizontal run (1); headroom (1); support arrangement (1); safe landings and access (1).
Question 4 (10 Marks)
(a) 5 marks: Restrict unsafe access (1); replace damaged boards (1); secure working platform (1); withdraw damaged ladder (1); inspect and reinstate safe equipment (1).
(b) 5 marks: Primary load support (1); secondary battens/purlins (1); weatherproof covering (1); ceiling finishing (1); services/thermal or acoustic considerations (1).

Community Join the conversation Open discussion +